CLIENT
PRODUCT
DATE
VINCI CONSTRUCTION–SPIE
Engineering, procurement and commissioning of a segment trolley, capacity 30mTons, Li8-1, Grand Paris Project
2021
BOUYGUES TP - T2A
Engineering, procurement and commissioning of hopper and skip, L15, Grand Paris Project
2021
EIFFAGE - TSO L16-1 & EOLE
Engineering, procurement and commissioning of 12 e-drive trollies with loading capacity of 1.6T L16-1, Grand Paris Project
2021
HS2-ALIGN JV
Engineering, procurement and commissioning of two tunnel in-situ Invert Bridges, HS2 Project
2021
EIFFAGE GC
Engineering, procurement and commissioning of all road loading equipment, capacity 20 Tons, L16-1 Grand Paris Project
2020
WEBUILD-NGE
Engineering, procurement and commissioning of three segment grabs, L16-2, Grand Paris Project
2020
COLAS RAIL
Engineering, procurement and commissioning of two ballast conveyors
2020
MILLET AFR
Manufacturing of 23 x cement rolling stock
2019
GTM SUD (VINCI Group)
Engineering, procurement and commissioning of a tunnel saw, mounted on wagon and trolley.
2019
NGE Contracting- TSO
Engineering procurement and commissioning of a rail production line in Uruguay
2019
COLAS RAIL
Engineering, procurement and commissioning of equipment to perform ballast and railway change RER A - Paris Metro
2018
EIFFAGE CG
Engineering, procurement and commissioning of six segment grabs, L16-1, Grand Paris Project
2018
NGE GC - ALLIANCE JV - L15 TC
Engineering, procurement and commissioning of a tunnel in-situ Invert Bridge, L15 TC, Grand Paris Project
2018
SOGEA (Vinci Group) MOA- SIAAP
Engineering, procurement and commissioning of a special MSV to load/unload sewage pipes in Argenteuil Tunnel
2018
BOUYGUES DRAGAGES
Tuen Mun – Check Lap Kok Link Tunnel
2016
ETF (VINCI)
Concrete Train: Santiago CHILE
2015
COLAS RAIL
Concrete Train: Santiago CHILE
2015
COLAS RAIL
Excavation Tub Lifting Gantry
2014
COLAS RAIL
Mobile Lifting Gantry on Wagon – Channel
2013
COLAS RAIL
Rail Decarbonising Machine – Channel
2013
BOUYGUES DRAGAGES
Segment Grab: Hong Kong
2012
BOUYGUES DRAGAGES
Partition Wall Formwork: Hong Kong
2012
BOUYGUES DRAGAGES
Concrete Wall Reinforcement Gantry: Hong Kong
2012
BOUYGUES DRAGAGES
Concrete U-Shape Formwork: Hong Kong
2012
BOMBELA JV
Concrete Wall Reinforcement Gantry: South Africa
2008
BOUYGUES SOLETANCHE BACHY
Cooling Ducts (Toulon Tunnel)
2008
BOMBELA JV
Concrete Gantry Device: South Africa
2008
BOUYGUES TP
Cable Channel Moulds (Haut Bugey)
2008
BOUYGUES TP
Dump Transfer Device: Mont Cenis Tunnel
2007
GIE A41
Handling Device: Mont Sion Tunnel
2007
EIFFAGE TP, BOUYGUES TP
Rail Handling Device: Maurice Lemaire Tunnel
2007
EIFFAGE TP, BOUYGUES TP
Concrete Train: Maurice Lemaire Tunnel
2007
BOUYGUES TP
Concrete Formwork: Grand Goulets Tunnel
2006
AMEC SPIE RAIL
Concrete Train
2005
CHANTIERS MODERNES FREYSSINET-NOUVETRA SOLET ANCHE-SECO-RAIL
Segment Drilling Machine: SNCF Paris
2004
BOUYGUES TP (Netherlands)
Multi Service Vehicle: Groenhaeërt Tunnel
2004
NHI- NFM
Segment Handling Device
2002
EUROTUNNEL
Rail Change Train in Channel
2000