VINCI CONSTRUCTION–SPIE

Engineering, procurement and commissioning of a segment trolley, capacity 30mTons, Li8-1, Grand Paris Project

2021

BOUYGUES TP - T2A

Engineering, procurement and commissioning of hopper and skip, L15, Grand Paris Project

2021

EIFFAGE - TSO L16-1 & EOLE

Engineering, procurement and commissioning of 12 e-drive trollies with loading capacity of 1.6T L16-1, Grand Paris Project

2021

HS2-ALIGN JV

Engineering, procurement and commissioning of two tunnel in-situ Invert Bridges, HS2 Project

2021

EIFFAGE GC

Engineering, procurement and commissioning of all road loading equipment, capacity 20 Tons, L16-1 Grand Paris Project

2020

WEBUILD-NGE

Engineering, procurement and commissioning of three segment grabs, L16-2, Grand Paris Project

2020

COLAS RAIL

Engineering, procurement and commissioning of two ballast conveyors

2020

MILLET AFR

Manufacturing of 23 x cement rolling stock

2019

GTM SUD (VINCI Group)

Engineering, procurement and commissioning of a tunnel saw, mounted on wagon and trolley.

2019

NGE Contracting- TSO

Engineering procurement and commissioning of a rail production line in Uruguay

2019

COLAS RAIL

Engineering, procurement and commissioning of equipment to perform ballast and railway change RER A - Paris Metro

2018

EIFFAGE CG

Engineering, procurement and commissioning of six segment grabs, L16-1, Grand Paris Project

2018

NGE GC - ALLIANCE JV - L15 TC

Engineering, procurement and commissioning of a tunnel in-situ Invert Bridge, L15 TC, Grand Paris Project

2018

SOGEA (Vinci Group) MOA- SIAAP

Engineering, procurement and commissioning of a special MSV to load/unload sewage pipes in Argenteuil Tunnel

2018

BOUYGUES DRAGAGES

Tuen Mun – Check Lap Kok Link Tunnel

2016

ETF (VINCI)

Concrete Train: Santiago CHILE

2015

COLAS RAIL

Concrete Train: Santiago CHILE

2015

COLAS RAIL

Excavation Tub Lifting Gantry

2014

COLAS RAIL

Mobile Lifting Gantry on Wagon – Channel

2013

COLAS RAIL

Rail Decarbonising Machine – Channel

2013

BOUYGUES DRAGAGES

Segment Grab: Hong Kong

2012

BOUYGUES DRAGAGES

Partition Wall Formwork: Hong Kong

2012

BOUYGUES DRAGAGES

Concrete Wall Reinforcement Gantry: Hong Kong

2012

BOUYGUES DRAGAGES

Concrete U-Shape Formwork: Hong Kong

2012

BOMBELA JV

Concrete Wall Reinforcement Gantry: South Africa

2008

BOUYGUES SOLETANCHE BACHY

Cooling Ducts (Toulon Tunnel)

2008

BOMBELA JV

Concrete Gantry Device: South Africa

2008

BOUYGUES TP

Cable Channel Moulds (Haut Bugey)

2008

BOUYGUES TP

Dump Transfer Device: Mont Cenis Tunnel

2007

GIE A41

Handling Device: Mont Sion Tunnel

2007

EIFFAGE TP, BOUYGUES TP

Rail Handling Device: Maurice Lemaire Tunnel

2007

EIFFAGE TP, BOUYGUES TP

Concrete Train: Maurice Lemaire Tunnel

2007

BOUYGUES TP

Concrete Formwork: Grand Goulets Tunnel

2006

AMEC SPIE RAIL

Concrete Train

2005

CHANTIERS MODERNES FREYSSINET-NOUVETRA SOLET ANCHE-SECO-RAIL

Segment Drilling Machine: SNCF Paris

2004

BOUYGUES TP (Netherlands)

Multi Service Vehicle: Groenhaeërt Tunnel

2004

NHI- NFM

Segment Handling Device

2002

EUROTUNNEL

Rail Change Train in Channel

2000

Ducrocq Project Overview